Filter Results By:

Products

Applications

Manufacturers

Power

a measure of watts in electricity and radiant energy in optics.

See Also: Power Quality


Showing results: 4846 - 4860 of 7502 items found.

  • Phasing for Mono-Band & Multi-Band Antennas

    StackMatch - Array Solutions

    The StackMatch control switch box has a rotary switch and three LEDs which display the antennas selected. Think of the three LEDs as the antennas arranged on a tower with number 3 in the ▲ being at the top of the tower, number 2 in the ● being in the middle, and number 1 in the █ at the bottom of the stack. As the rotary switch is turned these LEDs will light up in a pattern which indicates which antennas are being fed power from the StackMatch. You will see these symbolsalso on "little towers" or lines arranged around the rotary switch knob. Just point the knob to the desired pattern and the LEDs will light to indicate in the same pattern as chosen with the switch.

  • Power Meters

    Teledyne LeCroy

    Teledyne Test Tools range of digital power meters are for single-phase (1P/2W) AC power measurements with a test Bandwidth ranging from DC, 0.1 Hz to 100 kHz. The T3PM1006 model features a 4” TFT LCD screen with a five-digit measurement display. It offers 19 power measurement parameters to choose from, integration measurement function, front/rear panel input terminals, and various communication interfaces to help users to make convenient and accurate power measurement. The T3PM1100 model offers DC, 0.1 Hz ~ 100 kHz test bandwidth, 16 bits ADC, and 300 kHz sampling rate. It features a 5” TFT LCD screen with a five-digit measurement display. It also has options to display waveform (voltage/current/power), the integration measurement function, harmonic measurement and analysis of each order (meeting the IEC 61000-4-7 harmonics measurement requirements at 50/60 Hz), external sensor input terminals, and various communication interfaces to help users to make convenient and accurate power measurements.

  • Single-Tenant Colocation Cabinets

    SmartCabs - Cyxtera Technologies

    Benefit from the scale and speed of the cloud while still retaining the control, performance, and security of a dedicated infrastructure. SmartCabs are single-tenant colocation cabinets that come complete with built-in power and network connectivity as well as access to the Digital Exchange, our configurable core network fabric.

  • Global Data Center Platform

    Cyxtera - Cyxtera Technologies

    Centralize your complete data ecosystem through a software-defined platform that offers on-demand provisioning and customization of each of the elements of a traditional data center - including storage, compute power, networking and management.

  • Transmission Operations

    Schweitzer Engineering Laboratories, Inc.

    The safe and efficient operation of transmission facilities requires that critical information be sent to SCADA and system operators. With this knowledge, they can respond quickly and appropriately to power system events.

  • Control Center

    Schweitzer Engineering Laboratories, Inc.

    The essential elements in the reliable operation of the bulk electric system (BES) are control centers that continuously monitor and control generation and transmission power flows. Visualization, situational awareness, and analytic software help ensure that control center personnel always know what is happening with the BES.

  • Power System Automation

    Schweitzer Engineering Laboratories, Inc.

    Automate your power system with SEL instrumentation and control devices. Substation automation uses data from IEDs, control and automation capabilities within the substation, and control commands from remote users to control power system devices.

  • Fault Indicators and Sensors

    Schweitzer Engineering Laboratories, Inc.

    This technology detects overcurrent faults on overhead and underground lines to speed up power restoration and enhance protection.

  • Industrial Control

    Schweitzer Engineering Laboratories, Inc.

    Industrial control systems require reliable automation solutions that can integrate with relays, meters, and plant controls to ensure the safe operation of industrial facility power systems.

  • Industrial Operations

    Schweitzer Engineering Laboratories, Inc.

    Comprehensive power management systems optimize power delivery to minimize production interruptions and save money. SEL power management, process control, and automation products are designed for the conditions common in industrial power systems.

  • Facility Fault Diagnosis System And Safety Management System

    Scien Co., Ltd.

    A system for diagnosing failures of rotating machinery such as turbines, motors, pumps, fans, and compressors, which are major facilities in nuclear power, hydropower, thermal power plants, petrochemical plants, shipbuilding, and aviation, through displacement sensors.

  • Power Supplies

    Sefram

    Sets a new standard for general purpose benchtop power supplies. It includes many features and functions that can be found in high performance instruments.

  • Digital RF Power &VSWR Measurement System

    PowerMaster II - Array Solutions

    Thank you for purchasing the Array Solutions PowerMaster II RFPower/VSWR Indicator. The PowerMaster II represents a breakthrough in features for measurement of the performance of your transmitting system. Microprocessor control insures fast capture time and low power consumption. With the ability to monitor your VSWR and power levels at all times, you will know that your transmitter, RF source, and load, or antenna systems are operating effectively and safely. In addition, the power and VSWR relay alarms can quickly shut down your power amplifier system and alert you to the alarm condition. This places an additional layer of protection in your transmitting system to help preserve expensive tubes and finals. The PowerMaster II also features the ability to be monitored and controlled from a PC using the software downloadable from our website, and the unique ability to be monitored and controlled over a LAN or from the internet. PowerMaster II firmware updates will be posted for download from the Array Solutions website as they become available. This means that the user can take full advantageof features or enhancements just by installing the firmware update. No need to return the meter to the factory for updates

  • Digital RF Power &V.S.W.R. Indicator

    PowerMaster Series - Array Solutions

    Thank you very much for purchasing the Array Solutions PowerMaster Series RF Power/VSWR Indicator. The PowerMaster represents a breakthrough in features for measurement of the performance of your transmitting system. Microprocessor control insures fast capture time and low power consumption. With the ability to monitor your VSWR and power levels at all times, you will know that your transmitter, RF source, and load, or antenna systems are operating effectively and safely. In addition, the power and VSWR relay alarms can quickly shut down your power amplifier system and alert you to the alarm condition. This places an additional layer of protection in your transmitting system to help preserve expensive tubes and finals. The PowerMaster also features the ability to be monitored and controlled from a PC via the bundled software, and the unique ability to be monitored and controlled over a LAN or from the internet. PowerMaster firmware updates will be made available for download from the Array Solutions website as they becomeavailable. This means that the user can take full advantage of features or enhancements just by installing the firmware update. No need to return the meter to the factory for updates.

  • Wattmeter

    PowerMaster II for SO2R - Array Solutions

    The Power Master II wattmeter has the ability to have two couplers connected to it, and it has provision to allow switching very easily between the two couplers through only two button presses on the front panel.When operating SO2R, you do not want to have to toggle from one coupler to another. We make matched couplers available for SO2R users and due to the nature of these couplers being high impedancedevices, we can actually connect the two coupler inputs in parallel and instead of toggling between the two couplers, they will both be connected and active at the same time. The first step is to disconnect all connections to the rear panel of your Power Master II and remove the two #6-32 philips screws on either side of the cabinet.

Get Help