Off-Line Base Test Platforms
To configure your Base Test Platform, the following parts can be added to the 6TL-19 bare half-rack:
– Test Rack Manager, to control the test station.
– Power Distribution Unit.
– Uninterruptible Power Supply
– Industrial PC or NI PXI to control the platform
– 19’’ Monitor and keyboard with trackball
– VPC Mass Interconnect Receiver (6 or 12 slots)
– YAV Modules
– Accessories: Beacon, Air inlet Pneumatic kit…
– Any 19’ Instrument
See Also
- Uninterruptable Power Supplies
- Power Supplies
- Test Platform
- UPS
- Test
- Testing
- CAT6
- CAT 6
- Mass Interconnect
- Power Distribution
- PSU
- Control
- Controllers
- Power
- PXI Controllers
- A/D
- ADC
- A/D Converters
- Air
- Analog-to-Digital Converters
- Beacon
- Distribution
- Instrumentation
- Instruments
- Interconnects
- Modulation
- Modulators
- Modules
- Monitoring
- Monitors
- Over-the-air
- PC
- Pneumatic
- PXI
- Racks
- Receivers






