Meter Engineering Board

Meter Engineering Board

Perform qualification, disconnect, communication, and advanced functional tests with TESCO’s new Meter Engineering Board. With basic metrology (0.1% accuracy) TESCO’s new MEB can also be used as a demand board or a time-run board, as part of meter certification, or to meet regulatory testing requirements. A new socket design provides automated operation to make loading easier. All new TESCO boards include our new electronically actuated sockets.

Get Help